What to Consider When Placing a Container Home on a Property with an Existing House

  • Writer: Ednir D’Oliveira
    Ednir D’Oliveira
  • 15 hours ago
  • 4 min read

Adding a container home as an accessory dwelling unit (ADU) on a property that already has a primary residence can be a smart way to create rental income, house family members, or add flexible living space. However, placing a second dwelling on one lot introduces layers of regulatory, utility, and infrastructure considerations that don’t apply to a standalone build.


Before moving forward, it’s important to understand how zoning, utilities, and structural classification affect the project. Luckily we’re here to help with all of that.


Zoning and ADU Approval

The first step is confirming that the property is legally allowed to have an ADU. Some cities specifically permit accessory dwelling units in certain residential districts, while others restrict them by lot size, minimum square footage, or owner-occupancy requirements.


Even if the city allows ADUs, you may need:

  • A specific ADU permit

  • A site plan showing setbacks and placement

  • Separate addressing

  • Additional parking spaces


Setback requirements often differ for accessory structures versus primary residences. Height restrictions and lot coverage limits can also impact placement.


Electrical Service Capacity

One of the most common issues when adding a container home as an ADU is electrical capacity. The existing home’s service panel and main breaker may not have enough capacity to support a second dwelling.


If the container home will share power with the main residence, the following may be required:

  • Upsizing the main service panel

  • Increasing the main breaker rating

  • Upgrading the service drop from the utility

  • Adding a subpanel dedicated to the ADU


In some cases, especially if the main service is already near capacity, the ADU may require its own separate electric meter. This depends on utility provider policies and local regulations.


Planning for electrical capacity early can prevent costly upgrades later.


Water and Sewer Considerations

Water and sewage infrastructure can significantly affect feasibility.


Septic Systems

If the property uses a septic system, the existing tank must be sized to handle the increased load of two dwellings. Septic capacity is typically calculated based on the number of bedrooms, not just the number of structures.


If the existing system is undersized, you may need:

  • A larger tank

  • An expanded leach field

  • A completely new septic system


Septic systems are generally regulated at the county or local level, so requirements will vary depending on jurisdiction. Approval often requires engineering review and inspection.


City or County Sewer

If the property connects to municipal sewer, the process is different. You may need:

  • A new sewer tap

  • Impact fees (one-time fee for adding demand to the system)

  • Separate billing approval

  • Inspection of lateral lines


Some municipalities allow the ADU to tie into the existing sewer connection, while others require separate connections. Utility department approval is essential before construction begins.


Water Supply

If on city water, verify whether the existing service line and meter can supply two dwellings. If on well water, you may need to confirm that:

  • The well has sufficient production capacity

  • The pressure system can handle additional demand

  • Local regulations permit multiple dwellings on one well


Foundation and Structural Classification

A common misconception is that shipping container homes are automatically considered manufactured housing. That is not necessarily the case.


MicroBoxes that are permanently anchored to a foundation and built to residential building code standards are not classified as HUD manufactured homes. Instead, they are treated as modular or site-built dwellings when permitted and installed properly.


This distinction matters because many cities designate specific districts for HUD-code manufactured homes, such as single-wide or double-wide trailers. Those zoning restrictions typically do not apply to IRC-compliant modular structures permanently installed on a foundation.


How the structure is classified can determine where it may legally be placed.


Stormwater and Drainage

Adding a second structure increases impervious surface area. Roof runoff, driveways, and walkways may affect drainage patterns on the property.


You may need:

  • Drainage planning

  • Gutters and downspouts tied into proper runoff areas

  • Compliance with local stormwater regulations


Some jurisdictions require updated drainage plans when adding an ADU.


Fire Separation and Access

Fire safety is another important consideration. Many cities require:

  • Minimum distance between the primary home and the ADU

  • Fire-rated wall assemblies if structures are close together

  • Adequate emergency access for fire services


If the ADU is located behind the main house, access pathways may need to meet minimum width requirements.


Parking Requirements

Some municipalities require additional off-street parking when adding an ADU. This can affect site layout and may require driveway expansion or additional paving.


Even if not strictly required, parking considerations can influence neighborhood acceptance and resale value.


Property Taxes and Utility Billing

Adding a second dwelling can change the property’s assessed value and tax liability. In some areas, the ADU may receive its own address, and in others it may not.


Utility billing policies also vary. Separate metering can simplify rental arrangements but may increase upfront costs.


HOA or Deed Restrictions

If the property is located within a subdivision governed by a homeowners association, deed restrictions may prohibit secondary dwellings regardless of city approval.


Always review private covenants before investing in permitting and design.


Final Thoughts

Adding a container home as an ADU can add flexibility, value, and income potential to a property. However, the success of the project depends on careful planning around utilities, zoning, infrastructure capacity, and regulatory classification.


Electrical service upgrades, septic sizing, sewer connections, drainage planning, and fire access are all critical factors that must be evaluated early. Proper classification as a permanently anchored modular dwelling, rather than a HUD manufactured home, can also make a significant difference in where and how the structure is allowed.


Approaching the project with a full understanding of these variables will help ensure the addition is compliant, functional, and built to last.